Final | 1/15/2001 | 1/16/2001 | 1/16/2001 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 01/15/2001 at 12:01:55. Contact: . final ok basment future 1/16/2001 9:11:42 AM
|
Plumbing Rough-in | 10/18/2000 | 10/18/2000 | 10/18/2000 | P | PASS |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 10/18/2000
|
Groundwork | 8/15/2000 | 8/16/2000 | 8/16/2000 | A | PASS |
Bill VanDegrift
|
|
|
MArty ###-####
|