Final | 11/9/2000 | 11/9/2000 | 11/9/2000 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/09/2000 at 10:50:26. Contact: ###-####.
|
Plumbing Rough-in | 8/23/2000 | 8/23/2000 | 8/23/2000 | P | PASS |
Bill VanDegrift
|
|
|
ROB ###-####-- R/I =RE-INSP
|
Plumbing Rough-in | 8/18/2000 | 8/18/2000 | 8/18/2000 | P | FAIL |
Bill VanDegrift
|
|
|
Rob ###-#### vent within 10' of window 8/21/2000 11:13:10 AM
|