Final | 9/26/2000 | 9/26/2000 | 9/26/2000 | P | PART |
Lee Rice
|
|
|
FOR TEMP OCC --JOHN ###-####just need to raise two air gaps
|
Plumbing Rough-in | 9/6/2000 | 9/6/2000 | 9/6/2000 | P | PASS |
Gerry Varner
|
|
|
waste and vent r/i John ###-####
|
Plumbing Rough-in | 9/6/2000 | 9/6/2000 | 9/6/2000 | P | PASS |
Gerry Varner
|
|
|
waste and vent r/i John ###-####
|
Plumbing Rough-in | 9/5/2000 | 9/5/2000 | 9/5/2000 | P | FAIL |
Gerry Varner
|
|
|
ready at 2:00 John ###-#### leak on underground waste 9/6/2000 8:12:29 AM
|
Plumbing Rough-in | 8/28/2000 | 8/28/2000 | 8/28/2000 | P | FAIL |
Bill VanDegrift
|
|
|
waste underground r/i ###-#### piping backgraded, needs clean fill, expose portion thats covered 8/28/2000 5:21:07 PM
|
Plumbing Rough-in | 8/24/2000 | 8/25/2000 | 8/25/2000 | A | PART |
Bill VanDegrift
|
|
|
john hardy-- ###-#### r/i partial gw ok still needs branch line to main 8/25/2000 1:25:12 PM
|