Final | 5/7/2001 | 5/8/2001 | 5/8/2001 | A | PASS |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 05/07/2001 at 15:04:14. Contact: ###-####.
|
Final | 5/2/2001 | 5/2/2001 | 5/2/2001 | P | NR |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 05/02/2001 at 08:32:26. Contact: ###-####.bronze or stainless steel circ pump required on domestic potable water faucets not set caulking not done relief valve not accessable for service 41/2" clerance required talked to plumber on phone 5/2/2001 11:48:53 AM
|
Plumbing Rough-in | 12/18/2000 | 12/18/2000 | 12/18/2000 | P | PASS |
Stan Johnson
|
|
|
Neil ###-####
|
Plumbing Rough-in | 12/13/2000 | 12/15/2000 | 12/15/2000 | A | FAIL |
Stan Johnson
|
|
|
###-####
|
Plumbing Rough-in | 12/15/2000 | 12/15/2000 | 12/15/2000 | P | NR |
Stan Johnson
|
|
|
R/I- NYLE CELL ###-####
|
Groundwork | 8/28/2000 | 8/28/2000 | 8/28/2000 | P | PASS |
Stan Johnson
|
|
|
Neil ###-#### pager--- groundwork--water on ground
|