Sprinkler (Final) | 10/9/2000 | 10/9/2000 | 10/9/2000 | P | PASS |
Stan Johnson
|
|
|
TODD ###-#### BACKFLOW INSP
|
Sprinkler (Final) | 10/4/2000 | 10/4/2000 | 10/4/2000 | P | PART |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 10/04/2000 at 07:33:18. Contact: ###-####.UNDERGROUND OK 10/4/2000 2:54:16 PM
|
Sprinkler (Final) | 10/2/2000 | 10/2/2000 | 10/2/2000 | A | FAIL |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 10/02/2000 at 06:04:55. Contact: ###-####.
|