Final | 1/2/2001 | 1/2/2001 | 1/2/2001 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 01/02/2001 at 10:15:05. Contact: ###-####.
|
Final | 12/22/2000 | 12/22/2000 | 12/22/2000 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/22/2000 at 08:20:32. Contact: ###-####.dishwasher and kitchen sink not installed 12/22/2000 2:13:37 PM
|
Plumbing Rough-in | 10/6/2000 | 10/9/2000 | 10/9/2000 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/06/2000 at 15:17:49. Contact: ###-####.
|
Plumbing Rough-in | 10/6/2000 | 10/6/2000 | 10/6/2000 | P | FAIL |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 10/06/2000 at 10:04:30. Contact: ###-####. wastetfailedest 10/6/2000 1:54:27 PM
|