Final | 12/22/2000 | 12/22/2000 | 12/22/2000 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/22/2000 at 08:19:40. Contact: ###-####.
|
Plumbing Rough-in | 10/12/2000 | 10/13/2000 | 10/13/2000 | A | PASS |
Bill VanDegrift
|
|
|
R/I ROB --###-####
|
Plumbing Rough-in | 10/10/2000 | 10/10/2000 | 10/10/2000 | P | FAIL |
Bill VanDegrift
|
|
|
r/i rob ###-#### cell move master tub and shower traps into warm area 10/11/2000 8:19:02 AM
|