PLM-Aging Inspection | 2/12/2003 | 2/12/2003 | 2/12/2003 | | PASS |
Bill VanDegrift
|
|
|
final ok 2/12/2003 8:48:40 AM
|
Final | 2/15/2001 | 2/20/2001 | 2/20/2001 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/15/2001 at 08:29:59. Contact: ###-####.
|
Final | 2/7/2001 | 2/8/2001 | 2/8/2001 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/07/2001 at 09:29:58. Contact: ###-####. wire sewage ejector, set last two emergency showers, complete t&p drain and rp drip cup drain by mop sink, set dish washer in lab, complete vtr's and flash 2/8/2001 10:38:46 AM
|
Plumbing Rough-in | 12/14/2000 | 12/14/2000 | 12/14/2000 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/14/2000 at 08:51:42. Contact: ###-####. partial ri ok , in walls at the river water treatment plant 12/14/2000 3:11:40 PM
|
Groundwork | 10/11/2000 | 10/12/2000 | 10/12/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 10/11/2000 iw gw test ok 10/12/2000 9:37:31 AM
|
Groundwork | 10/10/2000 | 10/11/2000 | 10/11/2000 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/10/2000 at 17:52:23. Contact: ###-####. s.s. ok 10/11/2000 3:22:57 PM
|