Final | 6/4/2001 | 6/5/2001 | 6/5/2001 | A | PASS |
Stan Johnson
|
|
|
FN STEVEN ###-####
|
Final | 5/24/2001 | 5/24/2001 | 5/24/2001 | P | CANC |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 05/24/2001 at 09:11:30. Contact: ###-####.
|
Final | 5/24/2001 | 5/24/2001 | 5/24/2001 | P | PART |
Lee Rice
|
|
|
Scheduled by Inspector: 309 On 5/24/2001 11:02:39 AM still a couple of fixtures short, caulk toilets and one lav, raise dishwasher loop and secure. check manibloc labeling on next stop. 5/24/2001 12:59:35 PM
|
Plumbing Rough-in | 2/14/2001 | 2/15/2001 | 2/15/2001 | A | PASS |
Gerry Varner
|
|
|
###-####
|
Plumbing Rough-in | 2/14/2001 | 2/14/2001 | 2/14/2001 | P | PART |
Gerry Varner
|
|
|
###-####
|
Plumbing Rough-in | 1/30/2001 | 1/31/2001 | 1/31/2001 | A | FAIL |
Gerry Varner
|
|
|
###-#### Steven conference only corrections needed 1/31/2001 8:45:50 AM
|
Plumbing Rough-in | 1/29/2001 | 1/30/2001 | 1/30/2001 | A | PASS |
Gerry Varner
|
|
|
###-#### conf only conference ok 1/30/2001 8:34:35 AM
|