Final | 12/29/2000 | 12/29/2000 | 12/29/2000 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/29/2000 at 10:17:12. Contact: ###-####.
|
Final | 12/29/2000 | 12/29/2000 | 12/29/2000 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/29/2000 at 10:17:12. Contact: ###-####.
|
Plumbing Rough-in | 12/15/2000 | 12/15/2000 | 12/15/2000 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/15/2000 at 07:18:09. Contact: ###-####.
|
Final | 12/11/2000 | 12/11/2000 | 12/11/2000 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/11/2000 at 09:49:38. Contact: ###-####. final ok water heater not part of this project, next phase will start 12/13/00 and t&p drain will be taken care of at that time, per chris a-1 12/11/2000 2:23:06 PM
|
Plumbing Rough-in | 10/31/2000 | 10/31/2000 | 10/31/2000 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/31/2000 at 09:53:51. Contact: ###-####. ri ok still need to run the relief line to the outside access not to bad from the addition 10/31/2000 4:35:55 PM
|