PLM-Aging Inspection | 1/31/2003 | 1/31/2003 | 1/31/2003 | | PASS |
Bill VanDegrift
|
|
|
finaled 1/31/2003 9:27:18 AM
|
Final | 5/30/2002 | 5/31/2002 | 5/31/2002 | P | CANC |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 05/30/2002 at 15:42:55. Contact: . clerks entered the wrong permit number 5/31/2002 10:44:29 AM
|
Plumbing Rough-in | 1/24/2002 | 1/25/2002 | 1/25/2002 | A | CANC |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 01/24/2002 at 15:49:55. Contact: .
|
Final | 6/13/2001 | 6/14/2001 | 6/14/2001 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 06/13/2001 at 15:17:15. Contact: ###-####.
|
Final | 6/6/2001 | 6/6/2001 | 6/6/2001 | P | PART |
Jim Johnson
|
|
|
partial final ###-####
|
Plumbing Rough-in | 2/13/2001 | 2/13/2001 | 2/13/2001 | P | PART |
Jim Johnson
|
|
|
John ###-#### east end of building drains and vents under water test ok, need to see test on hot and cold water system on next inspection. 2/13/2001 2:27:17 PM
|
Plumbing Rough-in | 1/29/2001 | 1/29/2001 | 1/29/2001 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 01/29/2001 at 11:04:40. Contact: ###-####. rough-in on middle 12 units of building waste water and vents ok 1/29/2001 3:24:34 PM
|
Plumbing Rough-in | 1/22/2001 | 1/23/2001 | 1/23/2001 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 01/22/2001 at 16:28:30. Contact: ###-####. test on 12 unit on west end waste and water ok needs end of line cleanout on 4 inch line on west end of building 1/23/2001 11:01:27 AM
|
Plumbing Rough-in | 1/18/2001 | 1/19/2001 | 1/19/2001 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 01/18/2001 at 16:13:55. Contact: ###-####.plumbing forman called off inspection was not ready will recall when ready 1/19/2001 12:05:10 PM
|
Groundwork | 11/17/2000 | 11/17/2000 | 11/17/2000 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/17/2000 at 09:35:37. Contact: ###-####. gw complete 11/17/2000 3:53:58 PM
|
Water and/or Sewer | 11/17/2000 | 11/17/2000 | 11/17/2000 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/17/2000 at 09:36:20. Contact: ###-####. water service just stubed out the building 11/17/2000 3:53:41 PM
|
Groundwork | 11/15/2000 | 11/16/2000 | 11/16/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/15/2000 at 11:55:50. Contact: ###-####. lower end up to the first bathroom group and western bathroom group 11/15/2000 4:29:24 PM
|
Groundwork | 11/7/2000 | 11/7/2000 | 11/7/2000 | P | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 11/7/2000 main sewer truk
|