Final | 1/22/2001 | 1/22/2001 | 1/22/2001 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 01/22/2001 at 10:22:43. Contact: ###-####.
|
Final | 1/19/2001 | 1/19/2001 | 1/19/2001 | P | FAIL |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 01/19/2001 at 10:20:24. Contact: ###-####. water heater needs to be rasied up to 18 inches off floor 1/19/2001 3:11:31 PM
|
Final | 1/11/2001 | 1/11/2001 | 1/11/2001 | P | PART |
Jim Johnson
|
|
|
###-#### lockbox BLU not ready contractor will recallwhen ready 1/11/2001 3:21:20 PM
|
Plumbing Rough-in | 11/15/2000 | 11/15/2000 | 11/15/2000 | P | PASS |
Jim Johnson
|
|
|
scott ###-#### r/i--re-insp
|
Plumbing Rough-in | 11/13/2000 | 11/13/2000 | 11/13/2000 | P | FAIL |
Gary Ziegler
|
|
|
SCOTT ###-#### R/I
|