Final | 1/29/2001 | 1/29/2001 | 1/29/2001 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 01/29/2001 at 10:39:37. Contact: ###-####. lockbox SUB
|
Plumbing Rough-in | 11/27/2000 | 11/27/2000 | 11/27/2000 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 11/27/2000 at 11:29:52. Contact: ###-####.
|