Final | 3/6/2001 | 3/6/2001 | 3/6/2001 | P | PASS |
Gerry Varner
|
|
|
###-#### LATE PM
|
Final | 2/28/2001 | 3/1/2001 | 3/1/2001 | A | FAIL |
Lee Rice
|
|
|
Steve ###-#### need hotsey connected, need larger thermal expansion tank, need 90 degree L,s on prv line and wh drain pan line, need 2- 2 hole straps on 2" vent in shop. 3/1/2001 10:35:44 AM
|
Water and/or Sewer | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PASS |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 01/08/2001 at 08:40:36. Contact: ###-####.
|
Plumbing Rough-in | 12/6/2000 | 12/7/2000 | 12/7/2000 | A | FAIL |
Gerry Varner
|
|
|
rough and a partial sewer Steve ###-####
|
Water and/or Sewer | 11/15/2000 | 11/15/2000 | 11/15/2000 | P | PART |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 11/15/2000 at 10:53:03. Contact: ###-####.
|
Groundwork | 11/14/2000 | 11/14/2000 | 11/14/2000 | P | PASS |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 11/14/2000 at 09:08:33. Contact: ###-####.
|