Final | 1/16/2001 | 1/16/2001 | 1/16/2001 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 07:29:08. Contact: ###-####.
|
Plumbing Rough-in | 11/30/2000 | 11/30/2000 | 11/30/2000 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 11/30/2000 at 07:36:32. Contact: ###-####.
|
Plumbing Rough-in | 11/29/2000 | 11/29/2000 | 11/29/2000 | P | FAIL |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 11/29/2000 at 08:31:47. Contact: ###-####.-contacted-plumber-on-traparm-to-mainbath-tub-will-recall-for-inspection-when-corrected 11/29/2000 3:24:07 PM
|