Final | 10/18/2001 | 10/19/2001 | 10/19/2001 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/18/2001 at 16:39:45. Contact: ###-####. the addition has no x-ray developer so it's final is ok with the hub drain copped, the chair relocation is complete in the old section. final ok 10/19/2001 9:57:21 AM
|
Med/Gas Systems | 10/10/2001 | 10/10/2001 | 10/10/2001 | A | PASS |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 10/10/2001 9:16:05 AM chair relocation south side in existing office, 24 hr. test ok
|
Plumbing Rough-in | 9/18/2001 | 9/18/2001 | 9/18/2001 | P | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 9/18/2001 3:54:54 PM ri for new hand sink and med gas for 2 new chairs at the south nd of the building test ok
|
Final | 5/18/2001 | 5/18/2001 | 5/18/2001 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 05/18/2001 at 09:34:54. Contact: ###-####. temp occ ok set x-ray etc. 5/18/2001 4:02:10 PM
|
Final | 5/14/2001 | 5/14/2001 | 5/14/2001 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 05/14/2001 at 09:42:11. Contact: ###-####. thermol expantion protection isolated from water heater, set all equipment, test all backflow preventors, provide med gas cert., turn 90s down and screen vacuum and compressed air terminations. 5/14/2001 3:03:44 PM
|
Plumbing Rough-in | 3/5/2001 | 3/6/2001 | 3/6/2001 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/05/2001 at 14:54:43. Contact: ###-####. test no good 3/6/2001 10:08:00 AM
|
Groundwork | 12/26/2000 | 12/26/2000 | 12/26/2000 | P | PART |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 12/26/2000 at 10:12:35. Contact: ###-####.basement only, c.o. not stubbed yet though 12/26/2000 2:09:20 PM . 12/26/2000 2:09:28 PM 12/26/2000 2:09:43 PM
|
Water and/or Sewer | 12/19/2000 | 12/20/2000 | 12/20/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/19/2000 at 15:18:34. Contact: ###-####. gw ok 12/20/2000 8:46:25 AM
|