Final | 5/2/2001 | 5/2/2001 | 5/2/2001 | P | PASS |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 05/02/2001 at 08:43:33. Contact: ###-####.
|
Final | 4/27/2001 | 4/27/2001 | 4/27/2001 | P | NR |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 04/27/2001 at 08:54:29. Contact: ###-####.
|
Plumbing Rough-in | 2/15/2001 | 2/16/2001 | 2/16/2001 | A | PASS |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 02/15/2001 at 11:31:27. Contact: ###-####.
|
Plumbing Rough-in | 2/13/2001 | 2/14/2001 | 2/14/2001 | A | FAIL |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 02/13/2001 at 19:18:06. Contact: ###-####.cross sectional area not met from required 4' building 2/14/2001 12:54:08 PM drain through roof 2/14/2001 12:54:31 PM 2/14/2001 12:56:25 PM
|
Plumbing Rough-in | 12/7/2000 | 12/7/2000 | 12/7/2000 | P | PASS |
Stan Johnson
|
|
|
as late as possible Kim ###-#### ground work 12/7/2000 3:35:55 PM
|