Final | 5/1/2001 | 5/2/2001 | 5/2/2001 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 13:41:49. Contact: ###-####.
|
Final | 4/30/2001 | 5/1/2001 | 5/1/2001 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 04/30/2001 at 17:32:41. Contact: ###-####.
|
Plumbing Rough-in | 3/5/2001 | 3/6/2001 | 3/6/2001 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 03/05/2001 at 16:43:41. Contact: ###-####.
|
Plumbing Rough-in | 3/1/2001 | 3/5/2001 | 3/5/2001 | P | FAIL |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 03/01/2001 at 07:59:06. Contact: ###-####. water and waste test faild. cross-sectional venting does not equal building drain. correct water distribution for hot water system. correct reverse grade on shower up stairs.support or strap hose bibs to grade in crawl. 3/5/2001 2:35:07 PM
|