Final | 8/15/2001 | 8/15/2001 | 8/15/2001 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 08/15/2001 at 08:55:41. Contact: ###-####.
|
Final | 8/13/2001 | 8/13/2001 | 8/13/2001 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 08/13/2001 at 08:25:27. Contact: ###-####. water line to fountain not needed remove and cap water line to double check. 8/13/2001 2:38:06 PM
|
Plumbing Rough-in | 3/8/2001 | 3/8/2001 | 3/8/2001 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 03/08/2001 at 08:03:41. Contact: ###-####.
|
Groundwork | 12/19/2000 | 12/19/2000 | 12/19/2000 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/19/2000 at 08:44:00. Contact: ###-####. CHANGE PEX TO WATER SERVICE GRADE TYPE PIPE FOR FOUNTAIN AS PER CONVERSATION WITH PLUMBING CONTRACTOR 12/19/2000 4:16:16 PM
|