Final | 3/28/2001 | 3/28/2001 | 3/28/2001 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 03/28/2001 at 09:29:55. Contact: ###-####.
|
Final | 3/27/2001 | 3/27/2001 | 3/27/2001 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 03/27/2001 at 09:25:32. Contact: ###-####. t&p needs to be piped to outside of building 3/27/2001 2:12:19 PM
|
Plumbing Rough-in | 1/26/2001 | 1/29/2001 | 1/29/2001 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 01/26/2001 at 15:32:39. Contact: ###-####.
|