Final | 3/2/2001 | 3/2/2001 | 3/2/2001 | P | PASS |
Jim Johnson
|
|
|
###-####
|
Final | 3/1/2001 | 3/1/2001 | 3/1/2001 | A | NR |
Jim Johnson
|
|
|
Rob Rogers ###-#### called for PM inspection. 3/1/2001 1:44:27 PM
|
Final | 3/1/2001 | 3/1/2001 | 3/1/2001 | P | FAIL |
Jim Johnson
|
|
|
Scheduled by Inspector: 360 On 3/1/2001 9:22:15 AM tub and shower trims not set. need to caulk fixtures to counter tops walls and floors. 3/1/2001 3:38:23 PM
|
Plumbing Rough-in | 1/19/2001 | 1/19/2001 | 1/19/2001 | P | PASS |
Jim Johnson
|
|
|
late pm ###-####
|