Final | 4/9/2001 | 4/10/2001 | 4/10/2001 | A | PASS |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 04/09/2001 at 16:34:16. Contact: ###-####.
|
Plumbing Rough-in | 2/23/2001 | 2/23/2001 | 2/23/2001 | A | PASS |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 02/23/2001 at 07:25:13. Contact: ###-####.
|
Plumbing Rough-in | 2/21/2001 | 2/22/2001 | 2/22/2001 | A | FAIL |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 02/21/2001 at 15:58:03. Contact: ###-####.pex required to be 18" from sweat joint 2/22/2001 2:39:43 PM
|