Final | 6/25/2001 | 6/26/2001 | 6/26/2001 | A | PASS |
Stan Johnson
|
|
|
###-####
|
Final | 6/19/2001 | 6/19/2001 | 6/19/2001 | P | PART |
Stan Johnson
|
|
|
###-####temp occ set two sinks washer box trim caulk emp shower faucet install service valve and union on vacum backflow reposition rp from on top of vacum pump 6/19/2001 12:36:37 PM
|
Med/Gas Systems | 4/20/2001 | 4/20/2001 | 4/20/2001 | A | PASS |
Stan Johnson
|
|
|
Scheduled by Inspector: 352 On 4/20/2001 8:58:17 AM
|
Plumbing Rough-in | 4/20/2001 | 4/20/2001 | 4/20/2001 | P | PASS |
Stan Johnson
|
|
|
Raul ###-####
|
Plumbing Rough-in | 4/18/2001 | 4/18/2001 | 4/18/2001 | P | FAIL |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 04/18/2001 at 08:05:32. Contact: ###-####. seperate intake and exaust air to be purged and brazed clean and bagged fittings required for air 4/18/2001 2:30:56 PM
|
Plumbing Rough-in | 3/27/2001 | 3/27/2001 | 3/27/2001 | P | PASS |
Stan Johnson
|
|
|
###-####water and drainage ok sump tank not set yet air and vacum not run 3/27/2001 11:31:37 AM
|
Groundwork | 2/21/2001 | 2/22/2001 | 2/22/2001 | A | FAIL |
Stan Johnson
|
|
|
Raul ###-#### partial building permit issued.
dual pumps required on comercial as per plans
2/22/2001 6:30:39 PM
|
Groundwork | 2/21/2001 | 2/22/2001 | 2/22/2001 | A | FAIL |
Stan Johnson
|
|
|
Raul ###-#### partial building permit issued.
dual pumps required on comercial as per plans
2/22/2001 6:30:39 PM
|