Final | 6/7/2001 | 6/7/2001 | 6/7/2001 | P | PASS |
Bill VanDegrift
|
|
|
###-####
|
Final | 6/5/2001 | 6/6/2001 | 6/6/2001 | A | NR |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 06/05/2001 at 10:49:28. Contact: ###-####.
|
Plumbing Rough-in | 5/25/2001 | 5/25/2001 | 5/25/2001 | P | CANC |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 05/25/2001 at 10:07:23. Contact: ###-####.
|
Plumbing Rough-in | 5/25/2001 | 5/25/2001 | 5/25/2001 | P | CANC |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 05/25/2001 at 10:07:23. Contact: ###-####.
|
Groundwork | 2/26/2001 | 2/26/2001 | 2/26/2001 | P | PASS |
Bill VanDegrift
|
|
|
###-#### this was a ri 2/26/2001 2:25:03 PM
|
Plumbing Rough-in | 2/26/2001 | 2/26/2001 | 2/26/2001 | P | PASS |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 2/26/2001 2:24:52 PM ri ok
|