PLM-Aging Inspection | 8/16/2001 | 8/16/2001 | 8/16/2001 | | PASS |
Jim Johnson
|
|
|
|
Final | 5/15/2001 | 5/16/2001 | 5/16/2001 | A | CANC |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 05/15/2001 at 13:25:39. Contact: ###-####.
|
Final | 5/15/2001 | 5/15/2001 | 5/15/2001 | P | PASS |
Lee Rice
|
|
|
Scheduled by Inspector: 309 On 5/15/2001 2:14:16 PM
|
Water and/or Sewer | 5/15/2001 | 5/15/2001 | 5/15/2001 | P | CANC |
Lee Rice
|
|
|
Scheduled by Inspector: 309 On 5/15/2001 2:13:28 PM
|
Plumbing Rough-in | 3/5/2001 | 3/5/2001 | 3/5/2001 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 03/05/2001 at 11:17:51. Contact: ###-####. had conversation with plumber about insulation for over head shower head 3/5/2001 3:14:40 PM
|
Plumbing Rough-in | 2/27/2001 | 2/28/2001 | 2/28/2001 | A | CANC |
Jim Johnson
|
|
|
###-####plumbing contractor called and canc. AM inspection 2/28/2001 10:30:44 AM
|
Plumbing Rough-in | 2/28/2001 | 2/28/2001 | 2/28/2001 | P | FAIL |
Jim Johnson
|
|
|
###-#### air test for waste and vents failed. need to strap or support vent above master shower. 2/28/2001 2:13:55 PM
|
Plumbing Rough-in | 2/27/2001 | 2/27/2001 | 2/27/2001 | P | CANC |
Jim Johnson
|
|
|
late pm ###-#### plumbing contractor called and canc. inspection. 2/27/2001 3:15:06 PM
|