Final | 1/7/2002 | 1/8/2002 | 1/8/2002 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 01/07/2002 at 14:32:36. Contact: ###-####.
|
PLM-Aging Inspection | 11/7/2001 | 11/7/2001 | 11/7/2001 | | FAIL |
Jim Johnson
|
|
|
|
Plumbing Rough-in | 8/7/2001 | 8/8/2001 | 8/8/2001 | A | PASS |
Stan Johnson
|
|
|
R/I - TOM ###-#### RE-INSP
|
Plumbing Rough-in | 7/25/2001 | 7/26/2001 | 7/26/2001 | A | FAIL |
Stan Johnson
|
|
|
###-####change out pex yard piping across garage tom will change to roll copper and instal hat trace be cause of shallow depth in garage heat trace to be installed as per manuf. insturctions 7/27/2001 7:55:38 AM
|
PLM-Aging Inspection | 6/13/2001 | 6/13/2001 | 6/13/2001 | | FAIL |
Stan Johnson
|
|
|
|