Final | 11/30/2001 | 11/30/2001 | 11/30/2001 | P | FAIL |
Bill VanDegrift
|
|
|
fn- jim -###-####--re-insp install rp on pond fill 11/30/2001 3:01:52 PM
|
Final | 10/19/2001 | 10/22/2001 | 10/22/2001 | A | FAIL |
Gerry Varner
|
|
|
###-#### provide a rpvb 10/22/2001 2:05:31 PM inplace of the dcvb for pond water source 10/22/2001 2:06:26 PM
|
Water and/or Sewer | 5/8/2001 | 5/8/2001 | 5/8/2001 | P | PASS |
Bill VanDegrift
|
|
|
Haney ###-####
|
Final | 5/3/2001 | 5/3/2001 | 5/3/2001 | P | PART |
Bill VanDegrift
|
|
|
###-#### interior ok temp occ ok, they just added a sewer relocation to this project so final when its complete 5/3/2001 2:34:10 PM
|
Plumbing Rough-in | 3/29/2001 | 3/30/2001 | 3/30/2001 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/29/2001 at 15:38:19. Contact: ###-####.
|
Groundwork | 3/26/2001 | 3/26/2001 | 3/26/2001 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/26/2001 at 10:11:50. Contact: ###-####.
|