Final | 8/27/2001 | 8/28/2001 | 8/28/2001 | A | PASS |
Gerry Varner
|
|
|
###-####
|
Final | 8/24/2001 | 8/27/2001 | 8/27/2001 | A | PART |
Gerry Varner
|
|
|
###-####
|
Final | 8/23/2001 | 8/24/2001 | 8/24/2001 | P | NR |
Gerry Varner
|
|
|
###-####
|
Final | 7/25/2001 | 7/25/2001 | 7/25/2001 | P | NR |
Gary Ziegler
|
|
|
Scheduled by Inspector: 334 On 7/25/2001 10:54:13 AM
|
Plumbing Rough-in | 6/21/2001 | 6/21/2001 | 6/21/2001 | P | PASS |
Jim Johnson
|
|
|
Scheduled by Inspector: 360 On 6/21/2001 5:04:05 PM
|
Plumbing Rough-in | 6/18/2001 | 6/19/2001 | 6/19/2001 | P | PART |
Jim Johnson
|
|
|
top off for drains and water joel ###-#### late pm finish t/p and pan drain lines need insolator's by kit and bath area on pex piping 6/19/2001 5:24:35 PM
|
PLM-Aging Inspection | 6/18/2001 | 6/18/2001 | 6/18/2001 | | PART |
Lee Rice
|
|
|
more time 6/18/2001 9:02:44 AM
|
Groundwork | 4/18/2001 | 4/18/2001 | 4/18/2001 | P | PASS |
Gerry Varner
|
|
|
###-####
|
Groundwork | 4/9/2001 | 4/9/2001 | 4/9/2001 | P | CANC |
Jim Johnson
|
|
|
###-####
|