PLM-Aging Inspection | 7/12/2001 | 7/12/2001 | 7/12/2001 | | DONE |
Jim Johnson
|
|
|
|
Water and/or Sewer | 4/12/2001 | 4/12/2001 | 4/12/2001 | A | PART |
Jim Johnson
|
|
|
Scheduled by Inspector: 360 On 4/12/2001 9:38:00 AM water line ok stillneed to finish sewer line out to property line ok to cover what has been inspected 4/12/2001 9:41:54 AM
|
Water and/or Sewer | 4/9/2001 | 4/10/2001 | 4/10/2001 | A | FAIL |
Jim Johnson
|
|
|
drew ###-#### w/s final need to change one inch building supply line to inch -one quarter. need approved materials where water and sewer cross.need to test both water and sewer lines.cleanouts to be installed in direction of flow need approved transition from pvc to abs pipe. 4/10/2001 11:29:41 AM
|