Final | 8/9/2001 | 8/10/2001 | 8/10/2001 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 08/09/2001 at 12:47:39. Contact: ###-####.
|
Final | 8/6/2001 | 8/7/2001 | 8/7/2001 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 08/06/2001 at 13:06:39. Contact: ###-####. need to test and certifiy d.c.v. called plumbing contractor 8/7/2001 11:52:37 AM
|
PLM-Aging Inspection | 7/9/2001 | 7/9/2001 | 7/9/2001 | | NR |
Jim Johnson
|
|
|
|
Plumbing Rough-in | 5/9/2001 | 5/9/2001 | 5/9/2001 | P | PASS |
Jim Johnson
|
|
|
Brent ###-#### main water trunk line and south end of building bath room rough-in ok 5/9/2001 2:57:07 PM
|
Groundwork | 4/10/2001 | 4/11/2001 | 4/11/2001 | A | PASS |
Jim Johnson
|
|
|
###-####
|