Final | 10/1/2001 | 10/2/2001 | 10/2/2001 | P | NH |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 10/01/2001 at 16:04:46. Contact: ###-####.
|
Final | 10/2/2001 | 10/2/2001 | 10/2/2001 | P | PASS |
Jim Johnson
|
|
|
Scheduled by Inspector: 360 On 10/2/2001 4:45:28 PM
|
Plumbing Rough-in | 9/6/2001 | 9/7/2001 | 9/7/2001 | P | PASS |
Bill VanDegrift
|
|
|
r/i tony ###-####
|
Plumbing Rough-in | 9/4/2001 | 9/5/2001 | 9/5/2001 | P | FAIL |
Bill VanDegrift
|
|
|
LATE PM TONY ###-#### vent lav, wb vent needs to be turned around, waste new tub into wc vent 9/5/2001 4:48:58 PM
|
Plumbing Rough-in | 6/21/2001 | 6/21/2001 | 6/21/2001 | P | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 6/21/2001 5:26:15 PM partial ri ok , will clean up main waste drop on phase 2 - kitchen removal and restroom addition
|
Plumbing Rough-in | 6/18/2001 | 6/19/2001 | 6/19/2001 | A | FAIL |
Bill VanDegrift
|
|
|
###-#### nail plates required on kitchen sink waste and vent, eplace vent 90's in kitchen sink waste in laundry room/hall doorway with 45's, 2" vented trap required on washer waste, vented trap required on tub waste. 6/19/2001 9:43:53 AM
|