Final | 3/7/2002 | 3/8/2002 | 3/8/2002 | A | PASS |
Bill VanDegrift
|
|
|
hugo ###-####
|
Final | 12/27/2001 | 12/27/2001 | 12/27/2001 | P | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 12/27/2001 3:12:04 PM temp occ ok
|
Plumbing Rough-in | 12/3/2001 | 12/4/2001 | 12/4/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 12/3/2001 4:29:27 PM 12:30 more duct drains 12/4/2001 3:01:01 PM
|
Plumbing Rough-in | 11/15/2001 | 11/15/2001 | 11/15/2001 | P | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 11/15/2001 2:39:24 PM a couple of more duct drains
|
Plumbing Rough-in | 11/13/2001 | 11/13/2001 | 11/13/2001 | P | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 11/13/2001 4:22:41 PM interstitial duct drains running test ok
|
Final | 11/8/2001 | 11/9/2001 | 11/9/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 11/8/2001 4:13:00 PM temp occ ok, no solvent or photo solvent waste streams shall be discharged untill those systems are approved by boise city. 11/9/2001 11:39:17 AM
|
Final | 11/7/2001 | 11/8/2001 | 11/8/2001 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 11/7/2001 4:27:58 PM tank test failed, some one from mortensen told them I didnt need to see the tank test I told them that was wrong information 11/8/2001 4:12:35 PM
|
Other | 11/6/2001 | 11/7/2001 | 11/7/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 11/6/2001 4:11:45 PM 9:30 boyce and tony d walk thrus and test report review am and pm 11/7/2001 4:27:32 PM
|
Final | 11/6/2001 | 11/6/2001 | 11/6/2001 | P | PART |
Bill VanDegrift
|
|
|
###-#### XENON conference 11/6/2001 4:12:06 PM
|
Other | 10/31/2001 | 10/31/2001 | 10/31/2001 | P | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 10/31/2001 3:00:16 PM left correction notice for jh kelly/ymc to secure a permit for all waste streams associated with their contract for this project, requested current systems cost for review from mortinson.
|
Final | 10/25/2001 | 10/25/2001 | 10/25/2001 | P | FAIL |
Bill VanDegrift
|
|
|
###-#### XENON jh kelley supplied me with more test reports dated after they were told to include me in on any future testing, I left the office to meet with my supervisor 10/26/2001 9:51:12 AM
|
Other | 10/11/2001 | 10/11/2001 | 10/11/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 10/11/2001 8:01:40 AM went overtest packages with boyce stevens, no iw package available, misc. tests pending, will call when ready 10/11/2001 3:17:27 PM
|
Plumbing Rough-in | 9/18/2001 | 9/18/2001 | 9/18/2001 | A | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 9/18/2001 10:51:24 AM drum unload system test ok
|
Plumbing Rough-in | 8/30/2001 | 8/31/2001 | 8/31/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 8/30/2001 2:18:12 PM 11:00 iw copper pumped side of t 8/31/2001 11:47:11 AM e copper slurry test ok 8/31/2001 11:47:23 AM
|
Plumbing Rough-in | 8/30/2001 | 8/30/2001 | 8/30/2001 | P | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 8/30/2001 2:17:11 PM hf, copper bldg 22 to tanks in basement test ok
|
Plumbing Rough-in | 8/24/2001 | 8/24/2001 | 8/24/2001 | P | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 8/24/2001 1:07:46 PM conference and walk through with bob hitchcock went over testing requirements walked pumped IW to connection with piping at bld 22 recieved test report from same
|
Plumbing Rough-in | 7/30/2001 | 7/31/2001 | 7/31/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 7/30/2001 5:03:36 PM walk thru complete, will check hanger spacing, pressure fittings in waste system, procede twards test 7/31/2001 11:00:00 AM
|
Plumbing Rough-in | 7/27/2001 | 7/27/2001 | 7/27/2001 | P | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 7/27/2001 4:04:15 PM partial walk thru need access to clean room
|
Plumbing Rough-in | 7/27/2001 | 7/26/2001 | 7/26/2001 | P | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 7/27/2001 9:16:23 AM partial walk thru, iw etc in basement
|
Plumbing Rough-in | 7/20/2001 | 7/20/2001 | 7/20/2001 | P | PART |
Bill VanDegrift
|
|
|
R/I --###-####= XEMON picked up iw shop drawings for review 7/20/2001 2:27:35 PM
|
Plumbing Rough-in | 7/13/2001 | 7/16/2001 | 7/16/2001 | A | CANC |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/13/2001 at 11:18:34. Contact: ###-####.
|