Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberPLM01-01236
StatusFinaled
Name YMC INC
Site Address 8000 FEDERAL WAY
Project NameMIC #24D/#24E-SHELL
Customer Number100464
ePlanReview 
Description
IW waste system... $921,375 AJC 4-23-01 11/6-additional value of 1,276,041.00 total valus of 2,197,416.00 lh
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final3/7/20023/8/20023/8/2002APASS
DetailsBill VanDegrift
hugo ###-####
Final12/27/200112/27/200112/27/2001PPART
DetailsBill VanDegrift
Added by Inspector: 330 On 12/27/2001 3:12:04 PM temp occ ok
Plumbing Rough-in12/3/200112/4/200112/4/2001APART
DetailsBill VanDegrift
Scheduled by Inspector: 330 On 12/3/2001 4:29:27 PM 12:30 more duct drains 12/4/2001 3:01:01 PM
Plumbing Rough-in11/15/200111/15/200111/15/2001PPART
DetailsBill VanDegrift
Added by Inspector: 330 On 11/15/2001 2:39:24 PM a couple of more duct drains
Plumbing Rough-in11/13/200111/13/200111/13/2001PPART
DetailsBill VanDegrift
Added by Inspector: 330 On 11/13/2001 4:22:41 PM interstitial duct drains running test ok
Final11/8/200111/9/200111/9/2001APART
DetailsBill VanDegrift
Scheduled by Inspector: 330 On 11/8/2001 4:13:00 PM temp occ ok, no solvent or photo solvent waste streams shall be discharged untill those systems are approved by boise city. 11/9/2001 11:39:17 AM
Final11/7/200111/8/200111/8/2001PFAIL
DetailsBill VanDegrift
Scheduled by Inspector: 330 On 11/7/2001 4:27:58 PM tank test failed, some one from mortensen told them I didnt need to see the tank test I told them that was wrong information 11/8/2001 4:12:35 PM
Other11/6/200111/7/200111/7/2001APART
DetailsBill VanDegrift
Scheduled by Inspector: 330 On 11/6/2001 4:11:45 PM 9:30 boyce and tony d walk thrus and test report review am and pm 11/7/2001 4:27:32 PM
Final11/6/200111/6/200111/6/2001PPART
DetailsBill VanDegrift
###-#### XENON conference 11/6/2001 4:12:06 PM
Other10/31/200110/31/200110/31/2001PPART
DetailsBill VanDegrift
Added by Inspector: 330 On 10/31/2001 3:00:16 PM left correction notice for jh kelly/ymc to secure a permit for all waste streams associated with their contract for this project, requested current systems cost for review from mortinson.
Final10/25/200110/25/200110/25/2001PFAIL
DetailsBill VanDegrift
###-#### XENON jh kelley supplied me with more test reports dated after they were told to include me in on any future testing, I left the office to meet with my supervisor 10/26/2001 9:51:12 AM
Other10/11/200110/11/200110/11/2001APART
DetailsBill VanDegrift
Scheduled by Inspector: 330 On 10/11/2001 8:01:40 AM went overtest packages with boyce stevens, no iw package available, misc. tests pending, will call when ready 10/11/2001 3:17:27 PM
Plumbing Rough-in9/18/20019/18/20019/18/2001APART
DetailsBill VanDegrift
Added by Inspector: 330 On 9/18/2001 10:51:24 AM drum unload system test ok
Plumbing Rough-in8/30/20018/31/20018/31/2001APART
DetailsBill VanDegrift
Scheduled by Inspector: 330 On 8/30/2001 2:18:12 PM 11:00 iw copper pumped side of t 8/31/2001 11:47:11 AM e copper slurry test ok 8/31/2001 11:47:23 AM
Plumbing Rough-in8/30/20018/30/20018/30/2001PPART
DetailsBill VanDegrift
Added by Inspector: 330 On 8/30/2001 2:17:11 PM hf, copper bldg 22 to tanks in basement test ok
Plumbing Rough-in8/24/20018/24/20018/24/2001PPART
DetailsBill VanDegrift
Added by Inspector: 330 On 8/24/2001 1:07:46 PM conference and walk through with bob hitchcock went over testing requirements walked pumped IW to connection with piping at bld 22 recieved test report from same
Plumbing Rough-in7/30/20017/31/20017/31/2001APART
DetailsBill VanDegrift
Scheduled by Inspector: 330 On 7/30/2001 5:03:36 PM walk thru complete, will check hanger spacing, pressure fittings in waste system, procede twards test 7/31/2001 11:00:00 AM
Plumbing Rough-in7/27/20017/27/20017/27/2001PPART
DetailsBill VanDegrift
Added by Inspector: 330 On 7/27/2001 4:04:15 PM partial walk thru need access to clean room
Plumbing Rough-in7/27/20017/26/20017/26/2001PPART
DetailsBill VanDegrift
Added by Inspector: 330 On 7/27/2001 9:16:23 AM partial walk thru, iw etc in basement
Plumbing Rough-in7/20/20017/20/20017/20/2001PPART
DetailsBill VanDegrift
R/I --###-####= XEMON picked up iw shop drawings for review 7/20/2001 2:27:35 PM
Plumbing Rough-in7/13/20017/16/20017/16/2001ACANC
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 07/13/2001 at 11:18:34. Contact: ###-####.