Final | 6/1/2001 | 6/1/2001 | 6/1/2001 | P | PASS |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 06/01/2001 at 09:19:29. Contact: ###-####.
|
Plumbing Rough-in | 5/3/2001 | 5/3/2001 | 5/3/2001 | P | PASS |
Stan Johnson
|
|
|
Added by Inspector: 352 On 5/3/2001 1:22:23 PM
|
Plumbing Rough-in | 5/1/2001 | 5/1/2001 | 5/1/2001 | P | FAIL |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 06:48:38. Contact: ###-####.12" required to pex from reccessed light 5/1/2001 4:40:45 PM
|