PLM-Aging Inspection | 1/7/2002 | 1/7/2002 | 1/7/2002 | | PASS |
Jim Johnson
|
|
|
|
Final | 11/5/2001 | 11/6/2001 | 11/6/2001 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 11/05/2001 at 15:16:57. Contact: ###-####. need to raise p.v.b. up to twelve inches above point of use in kit. area on hose reel 11/6/2001 12:26:43 PM
|
Final | 10/10/2001 | 10/11/2001 | 10/11/2001 | A | PART |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 10/10/2001 at 15:26:11. Contact: ###-####.
|
PLM-Aging Inspection | 10/8/2001 | 10/8/2001 | 10/8/2001 | | NR |
Gerry Varner
|
|
|
|
Plumbing Rough-in | 8/6/2001 | 8/6/2001 | 8/6/2001 | P | PART |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 08/06/2001 at 09:00:37. Contact: ###-####.
|
Plumbing Rough-in | 8/2/2001 | 8/2/2001 | 8/2/2001 | P | PART |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 10:54:05. Contact: ###-####. produce section
|
Plumbing Rough-in | 7/31/2001 | 7/31/2001 | 7/31/2001 | P | PART |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 07/31/2001 at 10:22:29. Contact: ###-####. bakery and meat area
|
Plumbing Rough-in | 7/26/2001 | 7/27/2001 | 7/27/2001 | A | PASS |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 07/26/2001 at 16:11:14. Contact: ###-####.
|
Roof Drains | 7/11/2001 | 7/12/2001 | 7/12/2001 | A | NR |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 07/11/2001 at 16:01:08. Contact: ###-####.
|
Plumbing Rough-in | 7/9/2001 | 7/10/2001 | 7/10/2001 | A | PART |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 07/09/2001 at 16:17:23. Contact: ###-####.
|
Plumbing Rough-in | 7/5/2001 | 7/5/2001 | 7/5/2001 | P | PART |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 07/05/2001 at 10:31:59. Contact: ###-####.
|
Roof Drains | 6/29/2001 | 6/29/2001 | 6/29/2001 | P | PART |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 06/29/2001 at 09:09:48. Contact: ###-####.
|
Groundwork | 6/25/2001 | 6/26/2001 | 6/26/2001 | A | PASS |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 06/25/2001 at 14:49:04. Contact: ###-####. under ground rain drains west end ok 6/26/2001 12:30:13 PM
|
Groundwork | 6/6/2001 | 6/6/2001 | 6/6/2001 | P | CANC |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 06/06/2001 at 07:31:53. Contact: ###-####.
|
Groundwork | 6/4/2001 | 6/4/2001 | 6/4/2001 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 06/04/2001 at 09:36:19. Contact: ###-####. grease line east end 6/4/2001 3:44:14 PM
|
Groundwork | 6/1/2001 | 6/1/2001 | 6/1/2001 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 06/01/2001 at 08:24:23. Contact: ###-####. 6/1/2001 5:26:58 PM
|
Groundwork | 5/31/2001 | 5/31/2001 | 5/31/2001 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 05/31/2001 at 11:17:50. Contact: ###-####. Area C air test on area c ok . 5/31/2001 1:39:21 PM
|
Groundwork | 5/30/2001 | 5/30/2001 | 5/30/2001 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 05/30/2001 at 10:21:18. Contact: ###-####. Area D air test on case drains in area D ok 5/30/2001 2:10:55 PM
|
Groundwork | 5/25/2001 | 5/25/2001 | 5/25/2001 | P | PART |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 05/25/2001 at 10:08:10. Contact: ###-####. C area
|
Groundwork | 5/24/2001 | 5/24/2001 | 5/24/2001 | P | PART |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 05/24/2001 at 08:16:41. Contact: ###-####. B area
|
Groundwork | 5/21/2001 | 5/22/2001 | 5/22/2001 | A | PASS |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 05/21/2001 at 16:49:44. Contact: ###-####. d area
|
Groundwork | 5/22/2001 | 5/22/2001 | 5/22/2001 | P | PASS |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 05/22/2001 at 10:24:31. Contact: ###-####. area D
|
Groundwork | 5/18/2001 | 5/21/2001 | 5/21/2001 | P | PART |
Gerry Varner
|
|
|
area C Steve Ash ###-####
|
Groundwork | 5/17/2001 | 5/18/2001 | 5/18/2001 | A | PART |
Gerry Varner
|
|
|
ground work in the C area Steve Ash ###-####
|
Groundwork | 5/15/2001 | 5/16/2001 | 5/16/2001 | A | PART |
Gerry Varner
|
|
|
area C ###-####
|
Groundwork | 5/14/2001 | 5/14/2001 | 5/14/2001 | P | PART |
Gerry Varner
|
|
|
###-#### area D
|
Groundwork | 5/10/2001 | 5/10/2001 | 5/10/2001 | P | PART |
Lee Rice
|
|
|
Steve Ash ###-####
|
Groundwork | 5/9/2001 | 5/9/2001 | 5/9/2001 | P | PASS |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 05/09/2001 at 11:01:07. Contact: ###-####.
|
Groundwork | 5/8/2001 | 5/8/2001 | 5/8/2001 | P | PASS |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 05/08/2001 at 09:01:40. Contact: ###-####.
in the C&D area
|
Groundwork | 5/3/2001 | 5/4/2001 | 5/4/2001 | A | PART |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 05/03/2001 at 16:48:57. Contact: ###-####.
Go to area D
|
Groundwork | 5/3/2001 | 5/3/2001 | 5/3/2001 | P | PART |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 05/03/2001 at 09:30:50. Contact: ###-####.
go to areas A & F
|