Final | 6/5/2001 | 6/5/2001 | 6/5/2001 | P | CANC |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 06/05/2001 at 08:32:10. Contact: ###-####.
|
Final | 6/5/2001 | 6/5/2001 | 6/5/2001 | P | PASS |
Stan Johnson
|
|
|
Added by Inspector: 352 On 6/5/2001 4:07:41 PM
|
Plumbing Rough-in | 5/7/2001 | 5/7/2001 | 5/7/2001 | P | PASS |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 05/07/2001 at 08:55:35. Contact: ###-####.
|