Final | 6/12/2001 | 6/12/2001 | 6/12/2001 | P | PASS |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 06/12/2001 at 07:53:10. Contact: ###-####.
|
Plumbing Rough-in | 5/17/2001 | 5/17/2001 | 5/17/2001 | P | PASS |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 05/17/2001 at 07:52:29. Contact: ###-####.
|
Plumbing Rough-in | 5/16/2001 | 5/16/2001 | 5/16/2001 | P | FAIL |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 05/16/2001 at 07:49:17. Contact: ###-####.transion coupling required on abs to pvc transition 5/16/2001 2:09:15 PM
|