Final | 7/18/2001 | 7/18/2001 | 7/18/2001 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 07/18/2001 at 09:46:11. Contact: ###-####.
|
Plumbing Rough-in | 5/25/2001 | 5/29/2001 | 5/29/2001 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 05/25/2001 at 11:56:50. Contact: ###-####.
|
Plumbing Rough-in | 5/25/2001 | 5/25/2001 | 5/25/2001 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by Inspector: 334 On 5/25/2001 12:02:22 PM
|
Plumbing Rough-in | 5/17/2001 | 5/17/2001 | 5/17/2001 | P | PART |
Bill VanDegrift
|
|
|
partial r/i ###-#### sewer outside, and everything inside except the shower wall 5/17/2001 1:39:51 PM
|
Plumbing Rough-in | 5/17/2001 | 5/17/2001 | 5/17/2001 | P | CANC |
Gary Ziegler
|
|
|
partial r/i ###-####
|