Final | 6/11/2001 | 6/12/2001 | 6/12/2001 | A | PASS |
Bill VanDegrift
|
|
|
Eddy ###-#### interceptor sewer test and final ok 6/12/2001 9:15:54 AM
|
Groundwork | 6/8/2001 | 6/8/2001 | 6/8/2001 | P | PART |
Bill VanDegrift
|
|
|
Marty ###-#### this was realy a pertial sewer from the interceptor to north offset at back fence, no connection to the sewer or test yet, they were just looking for the sewer main when i was there. 6/8/2001 5:02:13 PM
|
Plumbing Rough-in | 6/4/2001 | 6/4/2001 | 6/4/2001 | P | PART |
Bill VanDegrift
|
|
|
partial on grease interceptor Eddy ###-#### interior to 5' from tie in , exterior from bld to interceptor, interceptor needs test and vent downstream 6/4/2001 2:46:57 PM
|