Final | 11/16/2001 | 11/16/2001 | 11/16/2001 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/16/2001 at 10:37:53. Contact: ###-####.
|
Plumbing Rough-in | 9/21/2001 | 9/24/2001 | 9/24/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/21/2001 at 11:48:52. Contact: . vent existing toilet and tub trap above utility room, valve trap primer, run 1" thru water softener to hot water heater tee, thermol expantion protection required, ok to cover everything except utility room ceiling 9/24/2001 3:05:53 PM
|
PLM-Aging Inspection | 9/14/2001 | 9/14/2001 | 9/14/2001 | | PART |
Lee Rice
|
|
|
not ready 9/14/2001 9:44:36 AM
|
Plumbing Rough-in | 6/14/2001 | 6/14/2001 | 6/14/2001 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 06/14/2001 at 09:49:47. Contact: . this was a gw 6/14/2001 2:14:13 PM
|
Plumbing Rough-in | 6/12/2001 | 6/13/2001 | 6/13/2001 | A | CANC |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 06/12/2001 at 17:03:55. Contact: . general contractor called and told me not to show up, system leaked and he let the test off and he would call owner, no contact number entered for me to call 6/13/2001 8:58:27 AM
|