Final | 10/12/2001 | 10/12/2001 | 10/12/2001 | P | PASS |
Bill VanDegrift
|
|
|
###-#### james
|
Final | 10/11/2001 | 10/11/2001 | 10/11/2001 | P | PART |
Jim Johnson
|
|
|
###-#### JAMES move vent,s on roof away from swamp cooler install expansion tank for thermal expansion re plumb water heater no copper to galv. nipple,s 10/11/2001 3:54:13 PM
|
Final | 10/2/2001 | 10/3/2001 | 10/3/2001 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 12:58:19. Contact: ###-####. need backflow devices tested and certified need hose bib vacume breaker on boiler drain under fountain called left message 10/3/2001 2:39:25 PM
|
PLM-Aging Inspection | 9/10/2001 | 9/10/2001 | 9/10/2001 | | PART |
Lee Rice
|
|
|
60 more 9/11/2001 1:40:37 PM
|
Groundwork | 7/6/2001 | 7/9/2001 | 7/9/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/06/2001 at 14:21:39. Contact: ###-####.partial gw ok added 2 floor sinks one under the dishwasher and one under the prep table 7/9/2001 9:01:05 AM
|
Plumbing Rough-in | 6/26/2001 | 6/27/2001 | 6/27/2001 | P | PART |
Bill VanDegrift
|
|
|
James ###-#### top out waste water and vent partial ri ok in walls only, regrade and hang venting inceiling 6/27/2001 2:04:47 PM
|
Final | 6/14/2001 | 6/15/2001 | 6/15/2001 | P | PART |
Lee Rice
|
|
|
fn underground --james- ###-#### stopped by and checked on the guy. Didn't think he was ready or would be by P.M. so told him to call me when done. 6/15/2001 10:51:23 AM
|
Groundwork | 6/15/2001 | 6/15/2001 | 6/15/2001 | P | CANC |
Lee Rice
|
|
|
Scheduled by Inspector: 309 On 6/15/2001 10:52:07 AM
|
Groundwork | 6/15/2001 | 6/15/2001 | 6/15/2001 | P | PASS |
Lee Rice
|
|
|
Scheduled by Inspector: 309 On 6/15/2001 10:59:11 AM
|
Groundwork | 6/13/2001 | 6/14/2001 | 6/14/2001 | A | PART |
Bill VanDegrift
|
|
|
outside James ###-#### interceptor piping, foundation to sewer connection, tanks still need testing 6/14/2001 9:05:53 AM
|