Final | 7/5/2001 | 7/6/2001 | 7/6/2001 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 07/05/2001 at 15:20:29. Contact: ###-####.
|
Final | 6/21/2001 | 6/22/2001 | 6/22/2001 | P | PART |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 06/21/2001 at 16:34:09. Contact: ###-####.
|
Plumbing Rough-in | 6/19/2001 | 6/20/2001 | 6/20/2001 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 15:04:44. Contact: ###-####.
|