Final | 8/9/2001 | 8/10/2001 | 8/10/2001 | A | PASS |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 08/09/2001 at 14:12:45. Contact: ###-####.
|
Final | 8/7/2001 | 8/8/2001 | 8/8/2001 | A | FAIL |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 08/07/2001 at 16:46:17. Contact: ###-####.hbvb required on laundry sink hose threads 603.4.7 UPC 1997 8/8/2001 11:55:57 AM
|
Plumbing Rough-in | 6/21/2001 | 6/21/2001 | 6/21/2001 | P | PASS |
Stan Johnson
|
|
|
###-####
|