DOC - Permit Finaled | | | 3/12/2003 | | DONE |
|
|
|
already fn
|
Plumbing Rough-in | 6/10/2002 | 6/10/2002 | 6/10/2002 | P | PASS |
Bill VanDegrift
|
|
|
expiration / ###-#### Husband had surgery will finish when recovered extended till whenever, bill 6/10/2002 2:05:58 PM
|
Final | 1/2/2002 | 1/3/2002 | 1/3/2002 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 01/02/2002 at 17:01:22. Contact: ###-####. final ok with lav as a future fixture 1/3/2002 2:24:48 PM
|
PLM-Aging Inspection | 1/1/2002 | 1/1/2002 | 1/1/2002 | | NR |
Bill VanDegrift
|
|
|
|
Plumbing Rough-in | 10/1/2001 | 10/2/2001 | 10/2/2001 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 10/01/2001 at 12:00:16. Contact: ###-####. check addition drain tie in to exiting drinage system on final inspection also check addition tub drain on final 10/2/2001 11:33:40 AM
|
Plumbing Rough-in | 9/25/2001 | 9/25/2001 | 9/25/2001 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/25/2001 at 07:33:30. Contact: ###-####. need to change out 2 vent 90's on the lav waste and turn 2 santees in the ceiling around and test waste. 9/25/2001 3:29:02 PM
|
Other | 9/17/2001 | 9/17/2001 | 9/17/2001 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/17/2001 at 10:58:16. Contact: ###-####. conference ok drew pictures, pointed fingers 9/17/2001 3:12:11 PM
|