Final | 8/6/2002 | 8/6/2002 | 8/6/2002 | A | PASS |
Jim Johnson
|
|
|
|
Final | 5/31/2002 | 6/3/2002 | 6/3/2002 | P | PART |
Jim Johnson
|
|
|
ROBERT ###-#### 4th and 3rd floor trim ok 6/3/2002 6:15:47 PM
|
Plumbing Rough-in | 2/27/2002 | 2/27/2002 | 2/27/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by Inspector: 360 On 2/27/2002 3:13:26 PM third floor hot and cold water main,s test ok 2/27/2002 3:17:12 PM
|
Plumbing Rough-in | 2/14/2002 | 2/14/2002 | 2/14/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by Inspector: 360 On 2/14/2002 5:50:58 PM water,s for room, on second and first lloor,s air test ok will retest when tied to manabloc system 2/14/2002 5:55:18 PM
|
Plumbing Rough-in | 2/6/2002 | 2/6/2002 | 2/6/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by Inspector: 360 On 2/6/2002 5:57:54 PM water ( air test ) from manabloc to room,s on 3 and 4 floor ok. 2/6/2002 6:03:58 PM
|
Plumbing Rough-in | 2/1/2002 | 2/1/2002 | 2/1/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by Inspector: 360 On 2/1/2002 4:58:57 PM fifth section of d.w.v. floor,s 1 through 4 water test ok. this inspection is in building c 2/1/2002 5:26:55 PM
|
Plumbing Rough-in | 1/31/2002 | 1/31/2002 | 1/31/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by Inspector: 360 On 1/31/2002 5:34:07 PM fourth section of testing floor,s 1 through 4 water test ok this inspection is in building c 1/31/2002 5:38:05 PM
|
Plumbing Rough-in | 1/30/2002 | 1/30/2002 | 1/30/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by Inspector: 360 On 1/30/2002 5:52:54 PM third section of testing floor, 1 through 4 water test ok this inspection is in building C 1/30/2002 5:59:53 PM
|
Plumbing Rough-in | 6/27/2001 | 6/27/2001 | 6/27/2001 | P | PASS |
Gerry Varner
|
|
|
CONF ONLY\\
|