Final | 8/5/2002 | 8/6/2002 | 8/6/2002 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 08/05/2002 at 14:30:56. Contact: ###-####.
|
Final | 5/31/2002 | 6/3/2002 | 6/3/2002 | P | PART |
Jim Johnson
|
|
|
ROBERT ###-#### 4th and 3rd floor trim ok 6/3/2002 6:15:21 PM
|
Plumbing Rough-in | 3/28/2002 | 3/28/2002 | 3/28/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 03/28/2002 at 09:00:48. Contact: ###-####. CPVC water main,s in hall test ok 3/28/2002 4:29:20 PM
|
Plumbing Rough-in | 3/21/2002 | 3/22/2002 | 3/22/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 03/21/2002 at 17:31:32. Contact: ###-####. air test on manabloc,s test ok 3/22/2002 12:15:04 PM
|
Plumbing Rough-in | 3/18/2002 | 3/18/2002 | 3/18/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 03/18/2002 at 09:17:40. Contact: ###-####. public restroom,s and pool area test ok 3/18/2002 5:24:56 PM
|
Plumbing Rough-in | 3/6/2002 | 3/6/2002 | 3/6/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 03/06/2002 at 08:38:31. Contact: ###-####. part of kit and mech. area test ok. 3/6/2002 4:09:52 PM
|
Roof Drains | 3/6/2002 | 3/6/2002 | 3/6/2002 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 03/06/2002 at 08:39:46. Contact: ###-####.
|
Plumbing Rough-in | 2/26/2002 | 2/27/2002 | 2/27/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 02/26/2002 at 18:03:55. Contact: ###-####. third floor hot and cold water main,s tst ok 2/27/2002 3:15:45 PM
|
Plumbing Rough-in | 2/13/2002 | 2/14/2002 | 2/14/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 02/13/2002 at 16:57:46. Contact: ###-####. water for room,s on second and fifst floor,s air test ok will retest when tied to manabloc system 2/14/2002 5:58:23 PM
|
Plumbing Rough-in | 2/6/2002 | 2/6/2002 | 2/6/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 02/06/2002 at 11:10:07. Contact: ###-####. D.W.V. water test on section 1 and 2 - floor,s 1 through 4 ok. water ( air test ) from manabloc to room,s on floor,s 3 and 4 ok 2/6/2002 5:56:20 PM
|
Plumbing Rough-in | 2/5/2002 | 2/5/2002 | 2/5/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 02/05/2002 at 10:16:41. Contact: ###-####. second section on north side only floor,s 1 through 4 water test ok on D.W.V. 2/5/2002 5:38:57 PM
|
Plumbing Rough-in | 2/4/2002 | 2/4/2002 | 2/4/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 02/04/2002 at 10:14:33. Contact: ###-####.
|
Plumbing Rough-in | 2/1/2002 | 2/1/2002 | 2/1/2002 | P | NR |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 02/01/2002 at 10:51:56. Contact: ###-####.
|
Plumbing Rough-in | 1/31/2002 | 1/31/2002 | 1/31/2002 | P | NR |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 01/31/2002 at 10:36:02. Contact: ###-####.
|
Plumbing Rough-in | 1/29/2002 | 1/29/2002 | 1/29/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 01/29/2002 at 08:41:25. Contact: ###-####.fourth floor water to manabloc system,s air test ok 1/29/2002 5:53:37 PM
|
Plumbing Rough-in | 1/25/2002 | 1/25/2002 | 1/25/2002 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 01/25/2002 at 10:52:06. Contact: ###-####. all venting in fourth floor ceiling water test ok 1/25/2002 6:01:51 PM
|
Plumbing Rough-in | 1/23/2002 | 1/24/2002 | 1/24/2002 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 01/23/2002 at 18:13:59. Contact: ###-####. first 12 unit,s on east end of building water tested 1/24/2002 5:28:25 PM
|
Other | 1/8/2002 | 1/9/2002 | 1/9/2002 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 01/08/2002 at 15:40:33. Contact: ###-####. had conf. with plumbing foreman on tub waste and overflow,s 1/9/2002 1:15:18 PM
|
PLM-Aging Inspection | 12/24/2001 | 12/24/2001 | 12/24/2001 | | NR |
Jim Johnson
|
|
|
|
PLM-Aging Inspection | 10/22/2001 | 10/22/2001 | 10/22/2001 | | NR |
Gerry Varner
|
|
|
|
Groundwork | 8/20/2001 | 8/21/2001 | 8/21/2001 | A | PART |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 08/20/2001 at 17:04:41. Contact: ###-####.
|
Groundwork | 8/14/2001 | 8/15/2001 | 8/15/2001 | A | PART |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 08/14/2001 at 15:53:19. Contact: ###-####.
|
Storm Drains | 8/7/2001 | 8/8/2001 | 8/8/2001 | P | NR |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 08/07/2001 at 14:50:35. Contact: ###-####.
|
Groundwork | 7/30/2001 | 7/30/2001 | 7/30/2001 | P | PART |
Gerry Varner
|
|
|
###-####
|
Plumbing Rough-in | 6/27/2001 | 6/27/2001 | 6/27/2001 | P | PASS |
Gerry Varner
|
|
|
CONF ONLY
|