Final | 2/21/2003 | 2/25/2003 | 2/25/2003 | A | NR |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 2/21/2003 at 11:12:48 AM. Contact: ###-####. just needs sprinkler dcva tested 2/25/2003 10:43:19 AM
|
Final | 10/18/2002 | 10/21/2002 | 10/21/2002 | A | NR |
Bill VanDegrift
|
|
|
received postcard in mail-not ready for insp
|
Plumbing Rough-in | 2/21/2002 | 2/21/2002 | 2/21/2002 | P | PASS |
Jim Johnson
|
|
|
###-#### DEBBIE
|
Plumbing Rough-in | 1/28/2002 | 1/28/2002 | 1/28/2002 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 01/28/2002 at 08:27:50. Contact: ###-####. water waste and vent test ok will remove s-trap in shower trap arm, the next inspection will be for the rain water system inside the house. 1/28/2002 12:20:22 PM
|
PLM-Aging Inspection | 1/1/2002 | 1/1/2002 | 1/1/2002 | | NR |
Bill VanDegrift
|
|
|
|
PLM-Aging Inspection | 10/2/2001 | 10/2/2001 | 10/2/2001 | | NR |
Jim Johnson
|
|
|
no inspection requested 10/2/2001 8:29:04 AM
|
Groundwork | 7/3/2001 | 7/3/2001 | 7/3/2001 | P | PASS |
Gary Ziegler
|
|
|
Dan ###-####
|