Final | 9/12/2001 | 9/13/2001 | 9/13/2001 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/12/2001 at 15:54:17. Contact: ###-####.
|
Final | 9/11/2001 | 9/12/2001 | 9/12/2001 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 09/11/2001 at 17:13:06. Contact: ###-####. icee machine still need's to be installed 9/12/2001 11:02:37 AM
|
Final | 9/7/2001 | 9/7/2001 | 9/7/2001 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/07/2001 at 09:24:13. Contact: ###-####. set all equipment, air gap t&p drain, support t&p drain, temp occ ok 9/7/2001 2:42:38 PM
|
Plumbing Rough-in | 8/3/2001 | 8/6/2001 | 8/6/2001 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/03/2001 at 16:16:26. Contact: ###-####. craig will fax info on roof drain connections 8/6/2001 2:28:49 PM
|
Plumbing Rough-in | 8/6/2001 | 8/6/2001 | 8/6/2001 | P | CANC |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/06/2001 at 08:38:14. Contact: ###-####.--CANCEL PER CRAIG WITH LACY-DUPLICATE
|
Water and/or Sewer | 7/16/2001 | 7/16/2001 | 7/16/2001 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/16/2001 at 10:11:54. Contact: ###-####. sewer leaves building and enters right of way. called public works and hey will inspect 7/16/2001 1:31:18 PM
|
Groundwork | 7/9/2001 | 7/9/2001 | 7/9/2001 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/09/2001 at 09:38:39. Contact: ###-####.
|
Water and/or Sewer | 7/6/2001 | 7/6/2001 | 7/6/2001 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/06/2001 at 09:57:00. Contact: ###-####. water line ok 7/6/2001 2:21:34 PM
|