Water and/or Sewer | 7/18/2001 | 7/19/2001 | 7/19/2001 | A | PASS |
Gerry Varner
|
|
|
Bill ###-####
|
Water and/or Sewer | 7/18/2001 | 7/19/2001 | 7/19/2001 | A | PASS |
Gerry Varner
|
|
|
Bill ###-####
|
Water and/or Sewer | 7/16/2001 | 7/17/2001 | 7/17/2001 | A | PART |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 07/16/2001 at 13:23:30. Contact: ###-####.
|
Water and/or Sewer | 7/12/2001 | 7/13/2001 | 7/13/2001 | P | PART |
Bill VanDegrift
|
|
|
###-#### 2 storm drains and new building sewer from building to existing sewer test ok, flush test and camera 6" existing sewer on the west side of this proect to determine code compliance. 7/13/2001 3:34:13 PM
|
Plumbing Rough-in | 7/11/2001 | 7/12/2001 | 7/12/2001 | A | FAIL |
Gerry Varner
|
|
|
underground pipe bill ###-#### not ready 7/12/2001 1:41:52 PM
|
Plumbing Rough-in | 7/11/2001 | 7/12/2001 | 7/12/2001 | P | PASS |
Gerry Varner
|
|
|
underground pipe bill
|
Water and/or Sewer | 7/12/2001 | 7/12/2001 | 7/12/2001 | P | NR |
Gerry Varner
|
|
|
sewer line ###-####
|
Final | 7/10/2001 | 7/11/2001 | 7/11/2001 | P | FAIL |
Gerry Varner
|
|
|
fn ###-####--bill davis not complete 7/12/2001 8:51:20 AM
|
Plumbing Rough-in | 7/6/2001 | 7/9/2001 | 7/9/2001 | A | FAIL |
Gerry Varner
|
|
|
###-#### lower r.d lines 7/9/2001 1:12:49 PM
|
Plumbing Rough-in | 7/6/2001 | 7/9/2001 | 7/9/2001 | P | FAIL |
Gerry Varner
|
|
|
###-#### lower lines 7/9/2001 9:56:44 PM
|
Plumbing Rough-in | 7/6/2001 | 7/6/2001 | 7/6/2001 | P | NR |
Gerry Varner
|
|
|
###-####
|