Final | 11/27/2001 | 11/27/2001 | 11/27/2001 | P | NR |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/27/2001 at 10:26:33. Contact: ###-####. all corrections for this permit have been complete but no occ will be allowed untill masco has their lift station operational 11/27/2001 2:00:34 PM
|
Final | 11/21/2001 | 11/21/2001 | 11/21/2001 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/21/2001 at 10:52:39. Contact: ###-####. set sink in coference room, hook up dishwasher,no air gap fitting required, install st-12 expantion tank at water heater, solid covers required at the interceptor, fill interceptor for test, verify interceptor discharge dip tube is capped, lift station must be operational. 11/21/2001 4:16:52 PM
|
Other | 10/19/2001 | 10/22/2001 | 10/22/2001 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/19/2001 at 12:11:41. Contact: ###-####. this is the inspection request for the interceptor connection I looked at friday 10/22/2001 8:24:41 AM
|
Water and/or Sewer | 10/19/2001 | 10/19/2001 | 10/19/2001 | P | PASS |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 10/19/2001 3:46:38 PM interceptor piping ok still need interceptor test
|
Plumbing Rough-in | 10/9/2001 | 10/9/2001 | 10/9/2001 | P | PART |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 10/09/2001 at 10:03:55. Contact: ###-####.
|
Roof Drains | 9/26/2001 | 9/27/2001 | 9/27/2001 | A | PASS |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 09/26/2001 at 14:59:08. Contact: ###-####.
|
Plumbing Rough-in | 9/24/2001 | 9/25/2001 | 9/25/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/24/2001 at 14:07:04. Contact: ###-####. partial ri ok office area 9/25/2001 1:50:09 PM
|
Groundwork | 9/10/2001 | 9/10/2001 | 9/10/2001 | P | PASS |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 09/10/2001 at 11:10:16. Contact: ###-####.pipe protection installed and trench drain and trap primers and shop drain in. 9/10/2001 4:43:29 PM
|
Groundwork | 9/7/2001 | 9/7/2001 | 9/7/2001 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 09/07/2001 at 09:11:08. Contact: ###-####. office restroom ok missed floor drain in shop rest room ok trench drain still need,s to be done pipe protection through concret to be installed after back fill 9/7/2001 3:14:15 PM
|
Groundwork | 9/4/2001 | 9/5/2001 | 9/5/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/04/2001 at 13:27:43. Contact: ###-####. shop restroom gw ok 9/5/2001 8:58:28 AM
|
Groundwork | 7/30/2001 | 7/31/2001 | 7/31/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/30/2001 at 13:26:03. Contact: ###-####. shop floor drain still needs trench drain 7/31/2001 9:05:55 AM
|
Final | 7/27/2001 | 7/30/2001 | 7/30/2001 | A | NR |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/27/2001 at 15:51:41. Contact: ###-####.
|
Groundwork | 7/27/2001 | 7/30/2001 | 7/30/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/27/2001 at 14:58:43. Contact: ###-####. partial groundwork office area ok 7/30/2001 9:10:52 AM
|