Final | 5/7/2002 | 5/8/2002 | 5/8/2002 | A | PASS |
Jim Johnson
|
|
|
fn dan- ###-####
|
Final | 5/6/2002 | 5/7/2002 | 5/7/2002 | A | NR |
Jim Johnson
|
|
|
###-#### dan not ready will recall when ready 5/7/2002 11:06:22 AM
|
PLM-Aging Inspection | 1/21/2002 | 1/21/2002 | 1/21/2002 | | NR |
Jim Johnson
|
|
|
|
Final | 11/21/2001 | 11/21/2001 | 11/21/2001 | A | PART |
Jim Johnson
|
|
|
###-#### DAN need to repipe roof and overflow drain lines with approved d.w.v. drainage fitting,s support drain lines to wall both roof and overflow lines need to be tested 11/21/2001 5:21:42 PM
|
Final | 11/16/2001 | 11/19/2001 | 11/19/2001 | A | PART |
Jim Johnson
|
|
|
MARK ###-#### need to pipe roof drain,s on car wash building to out side need to provide secondary roof drainage for car wash building need gas-tight lid,s on car wash intercepter need non-potable water sign,s on hose bib,s on car wash building. air gap all draines to floor sink,s in main building, fasten hose bib,s on main building 11/20/2001 9:18:27 AM
|
Plumbing Rough-in | 9/28/2001 | 9/28/2001 | 9/28/2001 | P | PART |
Stan Johnson
|
|
|
r/i-- terry- ###-#### building ri complete car wash not roughed in yet 9/28/2001 1:03:32 PM
|
Water and/or Sewer | 8/3/2001 | 8/3/2001 | 8/3/2001 | P | PASS |
Stan Johnson
|
|
|
###-####
|
Plumbing Rough-in | 7/26/2001 | 7/27/2001 | 7/27/2001 | A | PASS |
Stan Johnson
|
|
|
underground Darin ###-####grease lines and bathrooms and floor drains 7/27/2001 10:21:54 AM
|